00:00:00.600 --> 00:00:02.892
Thinking about your own home?

00:00:02.892 --> 00:00:05.537
Let's go through Aakar Studio together.

00:00:05.537 --> 00:00:11.356
We'll start with the land, tell it what your family needs, and then look at

00:00:11.356 --> 00:00:16.154
plans, the three-dimensional model and the downloads.

00:00:16.154 --> 00:00:18.447
Keep your land drawing nearby.

00:00:18.447 --> 00:00:21.444
You can pause whenever you need to.

00:00:21.444 --> 00:00:25.700
The longer guide explains the smaller choices in more detail.

00:00:26.400 --> 00:00:30.966
First, choose the municipality and ward where the land actually sits.

00:00:30.966 --> 00:00:36.536
These answers help select the local planning rules.

00:00:36.536 --> 00:00:42.564
If it's in an old-town or heritage area, check that answer with the local office.

00:00:42.564 --> 00:00:48.499
A map pin, where available, helps locate the site.

00:00:48.499 --> 00:00:52.900
It doesn't measure your boundary or confirm permission to build.

00:00:53.600 --> 00:01:07.287
Here's the important bit: nine aana tells us how much land there is, but not

00:01:07.287 --> 00:01:13.547
its shape. For a measured rectangle, enter the plot's width and depth in metres.

00:01:13.547 --> 00:01:24.080
Or enter the area in ropani and aana, or bigha and kattha, with the width

00:01:24.080 --> 00:01:31.761
along the road. That second method creates an approximate rectangle.

00:01:31.761 --> 00:01:35.200
An irregular plot needs its actual outline.

00:01:35.900 --> 00:01:43.469
If your plot bends or narrows, choose Draw the plot.

00:01:43.469 --> 00:01:49.595
Add each measured side and the correct corner angle, or use measured diagonals when those

00:01:49.595 --> 00:01:56.677
are available. A side direction and an inside corner angle are different things.

00:01:56.677 --> 00:02:00.947
Don't guess a missing number just to close the drawing.

00:02:00.947 --> 00:02:10.472
Check north, the final closing side and any warning before using this outline in the

00:02:10.472 --> 00:02:11.600
brief.

00:02:12.300 --> 00:02:18.895
Already have a clear site drawing as a photo or PDF?

00:02:18.895 --> 00:02:25.687
Open the tracing tool and mark its corners.

00:02:25.687 --> 00:02:37.485
Then give it a reliable real-world measurement so the picture has the right scale.

00:02:37.485 --> 00:02:40.242
Pixels alone aren't a land measurement.

00:02:40.242 --> 00:02:54.502
Check the outline and resulting dimensions before applying it.

00:02:54.502 --> 00:03:00.400
Keep the source drawing, especially if its area and the traced area don't agree.

00:03:01.100 --> 00:03:13.054
Now mark the road, its width, neighbouring buildings and open land on the correct sides.

00:03:13.054 --> 00:03:21.850
If you know a neighbour's height, enter it; otherwise leave the uncertainty visible.

00:03:21.850 --> 00:03:28.103
A shared or boundary-built wall can't be treated like an open garden side with normal

00:03:28.103 --> 00:03:37.257
windows. Also check that parking has a usable route from the road, not just a

00:03:37.257 --> 00:03:40.300
rectangle labelled as a parking bay.

00:03:41.000 --> 00:03:49.408
Decide how much ground the house should occupy and how much you'd like to leave

00:03:49.408 --> 00:03:54.952
as a yard. That's ground coverage, not the total area across all floors.

00:03:54.952 --> 00:04:01.260
Notice the difference between a preferred front yard and a minimum you insist on keeping.

00:04:01.260 --> 00:04:08.174
A strict minimum leaves less room for the house.

00:04:08.174 --> 00:04:14.300
For sloping land, describe the fall accurately; this still isn't a completed retaining-wall design.

00:04:15.000 --> 00:04:33.498
Let's think about your family now.

00:04:33.498 --> 00:04:39.098
Choose the storeys, bedrooms, bathrooms and any needs for elderly parents.

00:04:39.098 --> 00:04:48.871
A half storey means a partly built top floor.

00:04:48.871 --> 00:04:59.487
Add a study, Puja room or other extra only when you'll use it.

00:04:59.487 --> 00:05:03.367
These are room requirements, not a finished floor-by-floor arrangement.

00:05:03.367 --> 00:05:07.600
We'll check the actual arrangement once the options are generated.

00:05:08.300 --> 00:05:14.138
Want rental flats as well as your own home?

00:05:14.138 --> 00:05:17.521
Count the owner rooms and rental rooms separately.

00:05:17.521 --> 00:05:23.447
A street-facing shop takes ground-floor space too.

00:05:23.447 --> 00:05:27.185
Then enter how many cars and motorbikes need parking.

00:05:27.185 --> 00:05:32.311
These choices compete for the same land.

00:05:32.311 --> 00:05:38.481
In the result, check separate access, privacy and vehicle movement rather than assuming that every

00:05:38.481 --> 00:05:40.700
requested use will fit comfortably.

00:05:41.400 --> 00:05:46.688
The smaller answers matter too.

00:05:46.688 --> 00:05:55.281
Think about wardrobes, stair shape, balconies, drying clothes and a place to sit outside.

00:05:55.281 --> 00:05:59.505
A projecting balcony still needs room within the allowed space.

00:05:59.505 --> 00:06:06.197
Floor height, water storage and power backup need sensible project information.

00:06:06.197 --> 00:06:09.817
They're starting choices, not complete service designs.

00:06:09.817 --> 00:06:17.480
A crowded list of extras can make a small plot harder to plan, so keep

00:06:17.480 --> 00:06:19.700
your real priorities clear.

00:06:20.400 --> 00:06:41.714
Now for the fun part: what should the house feel like?

00:06:41.714 --> 00:06:45.590
Read the style description and look at its example.

00:06:45.590 --> 00:06:59.742
Where the planner offers a style-fit choice, it can try suitable planning changes.

00:06:59.742 --> 00:07:02.141
Check the fit report afterwards.

00:07:02.141 --> 00:07:08.541
A glass-heavy frontage doesn't automatically create an all-glass structure, and a courtyard style still

00:07:08.541 --> 00:07:11.200
needs enough land for a real courtyard.

00:07:11.900 --> 00:07:29.692
Try the wall colours, brick treatment, window design, doors, gate and kitchen finishes.

00:07:29.692 --> 00:07:33.158
You can coordinate the interior look as well.

00:07:33.158 --> 00:07:42.080
Keep one distinction in mind: changing a finish isn't the same as moving a window

00:07:42.080 --> 00:07:49.106
or rearranging the kitchen. Some visual details aren't measured in the estimate.

00:07:49.106 --> 00:07:57.228
If Vaastu matters to you, read the stated preference and any conflicts instead of assuming

00:07:57.228 --> 00:07:59.800
every rule has been satisfied.

00:08:00.500 --> 00:08:06.325
Before generating, check the brief once more.

00:08:06.325 --> 00:08:10.965
Especially check the land measurements, room counts and rental requirements.

00:08:10.965 --> 00:08:18.382
If the combination can't fit, read the message and change a real requirement.

00:08:18.382 --> 00:08:21.507
When options appear, look at every floor.

00:08:21.507 --> 00:08:28.973
Trace the route from the gate to the entrance, then to the bedrooms, bathrooms and

00:08:28.973 --> 00:08:33.400
outdoor areas. A nice ground-floor picture isn't the whole house.

00:08:34.100 --> 00:08:41.140
Compare the options using your family's priorities: privacy, circulation, room usefulness and outdoor

00:08:41.140 --> 00:08:44.945
space. Then inspect the drawing behind the comparison.

00:08:44.945 --> 00:08:50.850
If you make an edit, check whether it was accepted and what actually moved.

00:08:50.850 --> 00:08:58.075
A pending preview isn't the same as the accepted house used by downloads.

00:08:58.075 --> 00:09:03.800
After any change, check doors, windows and the route through nearby rooms again.

00:09:04.500 --> 00:09:10.182
Open the three-dimensional model and turn the house around.

00:09:10.182 --> 00:09:15.174
Try the roof and floor controls to understand how the rooms stack.

00:09:15.174 --> 00:09:21.935
Use the appearance and surroundings controls to inspect materials, daylight and the site.

00:09:21.935 --> 00:09:25.447
Then try the night lighting if it's available.

00:09:25.447 --> 00:09:32.948
This is useful for spotting awkward spaces, but a good-looking model doesn't prove that every

00:09:32.948 --> 00:09:37.400
visible finish is in the drawings or the cost estimate.

00:09:38.100 --> 00:09:42.669
Want a better sense of the rooms?

00:09:42.669 --> 00:09:46.439
Switch to walking and follow the real doorways.

00:09:46.439 --> 00:09:52.354
If you lose your place, return to orbit.

00:09:52.354 --> 00:09:58.914
An automatic house tour follows a prepared route; a high-quality film is another output again.

00:09:58.914 --> 00:10:06.248
Availability depends on the build, account and device.

00:10:06.248 --> 00:10:12.600
Read any room-coverage note, because the standard tour may leave out smaller rooms or balconies.

00:10:13.300 --> 00:10:23.156
Let's look at cost. Check the finish level, location rates, specifications and what's included.

00:10:23.156 --> 00:10:35.078
Your budget answer is used for comparison; it doesn't currently force the planner to generate

00:10:35.078 --> 00:10:45.369
within that amount. Material sizes, waste and reviewed quantities can change the estimate.

00:10:45.369 --> 00:10:49.201
Download the breakdown and exclusions before making a commitment.

00:10:49.201 --> 00:10:59.423
Treat it as a planning estimate, not a guaranteed contractor price or a proven five-percent

00:10:59.423 --> 00:11:00.900
accuracy claim.

00:11:01.600 --> 00:11:08.783
For the schedule, enter a realistic start date and crew capacity.

00:11:08.783 --> 00:11:16.117
Include holidays, weather delays and the required construction waits.

00:11:16.117 --> 00:11:24.850
Some tasks depend on earlier work, so adding people won't shorten every wait.

00:11:24.850 --> 00:11:28.035
Then check the payment and funding timeline.

00:11:28.035 --> 00:11:37.517
You can have enough money overall and still have a shortfall in a particular month

00:11:37.517 --> 00:11:42.400
if the loan or savings arrives after a payment is due.

00:11:43.100 --> 00:11:49.451
The soil questions need a little care.

00:11:49.451 --> 00:11:54.231
The seismic soil class describes how the ground affects earthquake shaking.

00:11:54.231 --> 00:12:01.366
Allowable bearing capacity describes what the foundation soil can support.

00:12:01.366 --> 00:12:03.699
They aren't the same number.

00:12:03.699 --> 00:12:11.485
Get both from the appropriate site investigation and your responsible engineer.

00:12:11.485 --> 00:12:17.625
Don't choose a safe-sounding answer from the neighbourhood name, a photograph or an informal test

00:12:17.625 --> 00:12:20.300
just to make the calculation run.

00:12:21.000 --> 00:12:30.401
Choose the structural system with your engineer: what carries the house is different from its

00:12:30.401 --> 00:12:39.801
exterior style. Concrete grade, starting column sizes, roof uses and stair details must represent the

00:12:39.801 --> 00:12:48.093
real proposal. Run the review and read every blocked or review item.

00:12:48.093 --> 00:12:54.845
If members are redrawn, check the rooms and openings again.

00:12:54.845 --> 00:13:00.725
Export the engineering files for professional review; a passing preliminary calculation isn't permission

00:13:00.725 --> 00:13:01.700
to build.

00:13:02.400 --> 00:13:11.365
Choose a download for the job: drawing files for CAD work, IFC for building-information exchange,

00:13:11.365 --> 00:13:19.237
or GLB for the furnished visual model.

00:13:19.237 --> 00:13:32.502
For SketchUp, keep the DAE model and textures together, import them and save in SketchUp;

00:13:32.502 --> 00:13:36.522
a native SKP download needs the configured converter.

00:13:36.522 --> 00:13:39.542
IFC isn't a native Revit file.

00:13:39.542 --> 00:13:47.504
Save the Aakar project too, so you can reopen it.

00:13:47.504 --> 00:13:51.500
Changes made in another application don't automatically return here.

00:13:52.200 --> 00:13:56.576
And that's the main journey.

00:13:56.576 --> 00:14:02.956
Start with honest measurements, keep your family's priorities clear, and check the same house across

00:14:02.956 --> 00:14:05.256
the drawings, model and estimate.

00:14:05.256 --> 00:14:08.822
Save the version you want to discuss.

00:14:08.822 --> 00:14:13.676
You now have a much clearer starting point for your architect and engineer.

00:14:13.676 --> 00:14:19.400
When you need a particular setting explained, use the chapters or open the complete guide.